Blog

PO Greenhouse Film for Winter: More Light When Days Are Short

2026-11-12
Greenhouse Film · Seasonal Guide

PO Greenhouse Film for Winter: More Light When Days Are Short

Winter is when a greenhouse earns or loses its season. Days are short, the sun sits low, and every point of light transmission is amplified — or lost. The answer is not more heating; it is more light. Three numbers decide how your cover performs from December to February: transmission, temperature range and lifespan.

💡 92%+ transmission 🌡️ −40 to +60 °C 📆 3–5 year lifespan 🧱 5-layer co-extrusion
92%+Light transmission
−40~+60°CWorking range
3–5 yrService life
5-layerCo-extrusion

Winter Is a Light Problem, Not Just a Temperature Problem

Growers talk about winter as a cold problem, but for a covered crop the binding constraint is usually light. Day length shrinks, the sun angle drops, and the same greenhouse that was bright in October turns dim in December. At low light levels, the difference between a cover that transmits 92%+ and an ordinary film is no longer a rounding error — it is the margin between crop growth and crop holding.

This is why PO film’s transmission is a winter feature, not a brochure number. The multi-layer optical structure keeps transmission high as the film ages, so the light you design for in autumn is still there in February.

What −40~+60 °C Actually Covers

The working range spans both extremes your tunnel will see: deep-winter nights on one end, closed-house summer peaks on the other. One film covers the whole year — you are not swapping covers seasonally, and the material is rated for the cold nights that crack lesser films. Note what this claim is: a rated working range for the film, verified by testing — not a promise about your heater.

Five Winters Without Replacement

A 3–5 year service life changes the winter arithmetic. Over the life of one PO cover, a seasonal film would have been bought, fitted and removed several times — each cycle costing film, labour and days of downtime in the worst weather of the year. Spreading one installation across five winters turns the covering into a scheduled capital item instead of an annual emergency.

Cost logic: compare covers per season of production, not per square metre. Film + labour + downtime divided by seasons delivered is the number that decides.

5-Layer Co-extrusion in Plain Terms

PO film is built in layers, each with a job: outer layers carry the UV stabiliser package that protects against year-round radiation, middle layers carry strength, and the inner layer carries the anti-drip effect that keeps condensation running to the gutter instead of dripping onto the crop. Five layers extruded together are why the film can hold transmission, strength and anti-drip at the same time — and hold them for years, not months.

When to Install Before Winter

The best installation window is before the first sustained cold snap: fitting film in mild weather is faster, safer and lets you tension it properly. If your current cover is already at end of life, replacing it in late autumn is almost always cheaper than gambling it through a winter. Our seasonal guide to replacing greenhouse film before winter walks through the timing and the inspection checklist.

Before you order
  • Send: span arc and length, anchoring method, crop, and your winter climate profile.
  • We return: a size check drawing, a thickness recommendation in the 100–200 mic range, and a quotation.
  • Terms: MOQ 1,000 kg per specification, lead time typically 30+ days, free samples for trial bays.

Frequently Asked Questions

PO or PE film for winter production?

For tunnels producing through winter and beyond, PO film: up to 92%+ transmission, a −40~+60 °C working range and a 3–5 year lifespan. Seasonal PE is a budget choice for short cycles; the comparison guide covers the full trade-off.

Can my current film survive one more winter?

Check transmission (yellowing), brittleness at the edges and any patch history. If two or more of those are failing, the film is past its reserve — replacing it in autumn costs less than a mid-winter tear-out.

What if my span is wider than a single piece?

Single-piece extrusion goes up to about 16 m; wider covers are produced as factory-seamed sheets with the seam positioned on the leeward side and reinforced.

How far ahead should I order for winter?

Lead time is typically 30+ days from order confirmation. Work backwards from your installation date and confirm the schedule with the quotation; free samples are available for trial bays first.

Related reading: Greenhouse Film Replacement Before Winter · PO Film vs PE Film · PO Greenhouse Film · Request a Quote

About the factory
  • Yinfeng Plastic has been extruding film since 1994 — 55,000+ tonnes a year across 5 lines on a 72,000 m² site, exporting to 100+ countries. Film test reports are issued by SGS; the factory is on the Sedex platform and has passed a SMETA audit; and the company is a China Strategic Partner of ExxonMobil.

Home Tel Mail Inquiry

✕

The 140th Canton Fair (Autumn 2026)

Phase 1 · Oct 15–19 · Booth 1.1I36

New Materials & Chemicals

Phase 2 · Oct 23–27 · Booth 16.4D32

Houseware

Agricultural film & film-based houseware — meet our export team.